{"data":[{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.it_mw","before":8,"after":67,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 8 MW → 67 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.facility_mw","before":11,"after":94,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 11 MW → 94 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"size.buildings_operational","before":1,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 3","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2025-12-31:epoch-ai-data-centers","date":"2025-12-31","kind":"milestone","milestone":"phase_operational","description":"Half the campus energized. 67 billable MW [are now dedicated](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf) to CoreWeave's GPUs across three buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Half the campus energized. 67 billable MW are now dedicated to CoreWeave's GPUs across three buildings.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.it_mw","before":72,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 72 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.facility_mw","before":101,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 101 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2025-12-31:epoch-ai-data-centers","date":"2025-12-31","kind":"milestone","milestone":"phase_operational","description":"Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.it_mw","before":105,"after":211,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 105 MW → 211 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.facility_mw","before":147,"after":295,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 147 MW → 295 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2025-12-24:epoch-ai-data-centers","date":"2025-12-24","kind":"milestone","milestone":"phase_operational","description":"Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742), but this date is also consistent with satellite imagery. By January 15, Building 2 looked as finished as Building 1, whereas on September 26 it did not look finished.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a TDLR filing, but this date is also cons…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.it_mw:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"power.it_mw","before":398,"after":626,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 398 MW → 626 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.facility_mw:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"power.facility_mw","before":478,"after":751,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 751 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:size.buildings_operational:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"size.buildings_operational","before":7,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 7 → 11","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:phase_operational:2025-12-23:epoch-ai-data-centers","date":"2025-12-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18.","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2025-12-09","date":"2025-12-09","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2025-12-09:epoch-ai-data-centers","date":"2025-12-09","kind":"milestone","milestone":"phase_operational","description":"Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned co…","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:size.buildings_operational:epoch-ai-data-centers:2025-12-07","date":"2025-12-07","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:status:epoch-ai-data-centers:2025-12-07","date":"2025-12-07","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-eagle-mountain","slug":"meta-eagle-mountain-eagle-mountain-ut","name":"Meta Eagle Mountain","state":"UT","county":"Utah County","orgIds":["meta","mortenson","williams","pacificorp"],"iso":"None (non-RTO region)","utilities":["pacificorp"],"id":"epoch-meta-eagle-mountain:phase_operational:2025-12-07:epoch-ai-data-centers","date":"2025-12-07","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.","url":"https://datacenters.prithvidixit.com/facilities/meta-eagle-mountain-eagle-mountain-ut","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-openai-stargate-michigan","slug":"openai-stargate-michigan-washtenaw-county-mi","name":"OpenAI Stargate Michigan","state":"MI","county":"Washtenaw County","orgIds":["oracle","openai","dte","related-digital"],"iso":"MISO","utilities":["dte"],"id":"epoch-openai-stargate-michigan:construction_start:2025-12-04:epoch-ai-data-centers","date":"2025-12-04","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for the entire site","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for the entire site","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-michigan-washtenaw-county-mi","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-723117951","slug":"stack-new-albany-franklin-county-oh","name":"STACK New Albany","state":"OH","county":"Franklin County","orgIds":["si-nal01a-abs-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-723117951:land_acquired:2025-12-02:county-franklin-oh","date":"2025-12-02","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 222-004355 (no sale price disclosed).","sourceId":"county-franklin-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 222-004355 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/stack-new-albany-franklin-county-oh","source":{"id":"county-franklin-oh","title":"Central Ohio Parcels (Franklin County Auditor data)","publisher":"City of Columbus GIS / Franklin County Auditor","url":"https://maps.columbus.gov/arcgis/rest/services/CityServices/KeyLayers/MapServer/3","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-11938631189","slug":"j-curve-technologies-maricopa-county-az","name":"J-Curve Technologies","state":"AZ","county":"Maricopa County","orgIds":["arc-tempe-2005-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"osm-node-11938631189:land_acquired:2025-12-01:county-maricopa-az","date":"2025-12-01","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 124-58-126: $11,700,000.","sourceId":"county-maricopa-az","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 124-58-126: $11,700,000.","url":"https://datacenters.prithvidixit.com/facilities/j-curve-technologies-maricopa-county-az","source":{"id":"county-maricopa-az","title":"Assessor Parcels","publisher":"Maricopa County Assessor's Office, AZ","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:power.it_mw:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"power.it_mw","before":47,"after":75,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 47 MW → 75 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:power.facility_mw:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"power.facility_mw","before":66,"after":106,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 66 MW → 106 MW","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:size.buildings_operational:epoch-ai-data-centers:2025-12-01","date":"2025-12-01","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat40","slug":"microsoft-sat40-san-antonio-tx","name":"Microsoft SAT40","state":"TX","county":"Bexar County","orgIds":["microsoft","medina-electric-coop-inc"],"iso":"ERCOT","utilities":["medina-electric-coop-inc"],"id":"epoch-microsoft-sat40:phase_operational:2025-12-01:epoch-ai-data-centers","date":"2025-12-01","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational. No more construction on building, and surrounding roads are also complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational. No more construction on building, and surrounding roads are also complete.","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat40-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":29,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}