{"data":[{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","county":"Fairfield County","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:power.it_mw:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"power.it_mw","before":68,"after":137,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 68 MW → 137 MW","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","county":"Fairfield County","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:power.facility_mw:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"power.facility_mw","before":82,"after":164,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 82 MW → 164 MW","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","county":"Fairfield County","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:size.buildings_operational:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","county":"Fairfield County","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:phase_operational:2025-10-31:epoch-ai-data-centers","date":"2025-10-31","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":4,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}