{"data":[{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:size.buildings_operational:epoch-ai-data-centers:2025-10-19","date":"2025-10-19","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:status:epoch-ai-data-centers:2025-10-19","date":"2025-10-19","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-colossus-2","slug":"colossus-2-memphis-ms","name":"Colossus 2","state":"MS","county":"DeSoto County","orgIds":["spacexai","anthropic","cursor"],"utilities":[],"id":"epoch-colossus-2:phase_operational:2025-10-19:epoch-ai-data-centers","date":"2025-10-19","kind":"milestone","milestone":"phase_operational","description":"Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of \"approximately 110,000 GB200 processors, approximately 210 megawatts of compute power\", as detailed in the [company S-1 filing, page 76](https://www.sec.gov/Archives/edgar/data/1181412/000162828026036936/spaceexplorationtechnologi.htm). Based on those numbers, we believe \"compute power\" corresponds to GPU server power. [Earlier](https://x.com/elonmusk/status/1947715674429919279) [tweets](https://x.com/elonmusk/status/1950251710141567110) from Elon Musk also support this timing, and it's consistent with the estimated cooling capacity based on the satellite image.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Battery facility looks complete (though more might be added). Turbines look connected up, minimal construction around them. We believe this state corresponds to the first compute cluster brought online at this site of…","url":"https://datacenters.prithvidixit.com/facilities/colossus-2-memphis-ms","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":3,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}