{"data":[{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:power.it_mw:epoch-ai-data-centers:2025-06-01","date":"2025-06-01","kind":"value","field":"power.it_mw","before":144,"after":222,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 144 MW → 222 MW","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:power.facility_mw:epoch-ai-data-centers:2025-06-01","date":"2025-06-01","kind":"value","field":"power.facility_mw","before":173,"after":267,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 173 MW → 267 MW","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:size.buildings_operational:epoch-ai-data-centers:2025-06-01","date":"2025-06-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:phase_operational:2025-06-01:epoch-ai-data-centers","date":"2025-06-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some…","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":4,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}