{"data":[{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.it_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.it_mw","before":45,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 45 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.facility_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.facility_mw","before":61,"after":243,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 61 MW → 243 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:size.buildings_operational:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"size.buildings_operational","before":1,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 4","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:phase_operational:2024-11-08:epoch-ai-data-centers","date":"2024-11-08","kind":"milestone","milestone":"phase_operational","description":"We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to th…","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":4,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}