{"data":[{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:size.buildings_operational:epoch-ai-data-centers:2024-11-19","date":"2024-11-19","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:status:epoch-ai-data-centers:2024-11-19","date":"2024-11-19","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:phase_operational:2024-11-19:epoch-ai-data-centers","date":"2024-11-19","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February…","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.it_mw:epoch-ai-data-centers:2024-11-19","date":"2024-11-19","kind":"value","field":"power.it_mw","before":79,"after":158,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 79 MW → 158 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.facility_mw:epoch-ai-data-centers:2024-11-19","date":"2024-11-19","kind":"value","field":"power.facility_mw","before":95,"after":189,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 95 MW → 189 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:size.buildings_operational:epoch-ai-data-centers:2024-11-19","date":"2024-11-19","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:phase_operational:2024-11-19:epoch-ai-data-centers","date":"2024-11-19","kind":"milestone","milestone":"phase_operational","description":"Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-muskogee-ok","slug":"coreweave-muskogee-ok-muskogee-ok","name":"CoreWeave Muskogee OK","state":"OK","county":"Muskogee County","orgIds":["coreweave","openai","oklahoma-gas-and-electric-co"],"iso":"SPP","utilities":["oklahoma-gas-and-electric-co"],"id":"epoch-coreweave-muskogee-ok:construction_start:2024-11-18:epoch-ai-data-centers","date":"2024-11-18","kind":"milestone","milestone":"construction_start","description":"Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific [says](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center) the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific says the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-muskogee-ok-muskogee-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.it_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.it_mw","before":45,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 45 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:power.facility_mw:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"power.facility_mw","before":61,"after":243,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 61 MW → 243 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:size.buildings_operational:epoch-ai-data-centers:2024-11-08","date":"2024-11-08","kind":"value","field":"size.buildings_operational","before":1,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 4","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-qts-hillsboro-2","slug":"meta-qts-hillsboro-2-hillsboro-or","name":"Meta-QTS Hillsboro 2","state":"OR","county":"Washington County","orgIds":["meta","pge-oregon","avangrid"],"iso":"None (non-RTO region)","utilities":["pge-oregon"],"id":"epoch-meta-qts-hillsboro-2:phase_operational:2024-11-08:epoch-ai-data-centers","date":"2024-11-08","kind":"milestone","milestone":"phase_operational","description":"We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to th…","url":"https://datacenters.prithvidixit.com/facilities/meta-qts-hillsboro-2-hillsboro-or","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:construction_start:2024-11-01:epoch-ai-data-centers","date":"2024-11-01","kind":"milestone","milestone":"construction_start","description":"Construction start - The [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706) reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy C…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-bowling-green","slug":"meta-bowling-green-bowling-green-oh","name":"Meta Bowling Green","state":"OH","county":"Wood County","orgIds":["meta","williams","the-toledo-edison-co"],"iso":"PJM","utilities":["the-toledo-edison-co"],"id":"epoch-meta-bowling-green:construction_start:2024-11-01:epoch-ai-data-centers","date":"2024-11-01","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/meta-bowling-green-bowling-green-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":14,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}