{"data":[{"facilityId":"epoch-meta-los-lunas","slug":"meta-los-lunas-los-lunas-nm","name":"Meta Los Lunas","state":"NM","county":"Valencia County","orgIds":["meta"],"utilities":[],"id":"epoch-meta-los-lunas:construction_start:2024-07-24:epoch-ai-data-centers","date":"2024-07-24","kind":"milestone","milestone":"construction_start","description":"Land clearing starts for new building.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing starts for new building.","url":"https://datacenters.prithvidixit.com/facilities/meta-los-lunas-los-lunas-nm","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:construction_start:2024-07-19:epoch-ai-data-centers","date":"2024-07-19","kind":"milestone","milestone":"construction_start","description":"Building 1 is operational, based on default roof-to-operational time.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Building 1 is operational, based on default roof-to-operational time.","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1059036248","slug":"stack-manassas-va","name":"STACK","state":"VA","county":"Prince William County","orgIds":["stack","si-nva-04-llc-attn-property-tax","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1059036248:land_acquired:2024-07-03:county-prince-william-va","date":"2024-07-03","kind":"milestone","milestone":"land_acquired","description":"Deed recorded for parcel 7595-76-6544.00 (owner of record: Si Nva 04 LLC Attn Property Tax).","sourceId":"county-prince-william-va","evidenceLevel":"confirmed","text":"Land acquired: Deed recorded for parcel 7595-76-6544.00 (owner of record: Si Nva 04 LLC Attn Property Tax).","url":"https://datacenters.prithvidixit.com/facilities/stack-manassas-va","source":{"id":"county-prince-william-va","title":"Parcel CAMA (Public)","publisher":"Prince William County, VA — GIS / Real Estate Assessments","url":"https://gisweb.pwcva.gov/arcgis/rest/services/GTS/CAMA_Parcels/MapServer/4","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:size.buildings_operational:epoch-ai-data-centers:2024-07-01","date":"2024-07-01","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:status:epoch-ai-data-centers:2024-07-01","date":"2024-07-01","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-sat14","slug":"microsoft-sat14-san-antonio-tx","name":"Microsoft SAT14","state":"TX","county":"Bexar County","orgIds":["microsoft","cps-energy"],"iso":"ERCOT","utilities":["cps-energy"],"id":"epoch-microsoft-sat14:phase_operational:2024-07-01:epoch-ai-data-centers","date":"2024-07-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously incomplete, so we believe it was only operational at this point.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously inc…","url":"https://datacenters.prithvidixit.com/facilities/microsoft-sat14-san-antonio-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":6,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}