{"data":[{"facilityId":"osm-way-258343749","slug":"amazon-iad-1-chantilly-va","name":"Amazon IAD-1","state":"VA","county":"Fairfax County","orgIds":["amazon","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-258343749:land_acquired:2024-06-25:county-fairfax-va","date":"2024-06-25","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0343 09  0004A (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/amazon-iad-1-chantilly-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-258343748","slug":"amazon-iad-22-chantilly-va","name":"Amazon IAD-22","state":"VA","county":"Fairfax County","orgIds":["amazon","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-258343748:land_acquired:2024-06-25:county-fairfax-va","date":"2024-06-25","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0343 09  0004A (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/amazon-iad-22-chantilly-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-marble-nc","slug":"coreweave-marble-nc-marble-nc","name":"CoreWeave Marble NC","state":"NC","county":"Cherokee County","orgIds":["coreweave","openai","duke-energy"],"iso":"None (non-RTO region)","utilities":["duke-energy"],"id":"epoch-coreweave-marble-nc:construction_start:2024-06-25:epoch-ai-data-centers","date":"2024-06-25","kind":"milestone","milestone":"construction_start","description":"Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-marble-nc-marble-nc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:power.it_mw:epoch-ai-data-centers:2024-06-23","date":"2024-06-23","kind":"value","field":"power.it_mw","before":47,"after":94,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 47 MW → 94 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:power.facility_mw:epoch-ai-data-centers:2024-06-23","date":"2024-06-23","kind":"value","field":"power.facility_mw","before":66,"after":132,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 66 MW → 132 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:size.buildings_operational:epoch-ai-data-centers:2024-06-23","date":"2024-06-23","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:phase_operational:2024-06-23:epoch-ai-data-centers","date":"2024-06-23","kind":"milestone","milestone":"phase_operational","description":"Building 2 (retrofitted) is operational. This is based on Building 2 looking compelte, and construction around Building 1 and 2 being mostly cleared. A colored motion artifact on one of the Building 1 cooling tower fans suggests it is moving. Building 3 cooling is installed, backup generators partly installed. Building 4 shell is under construction.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 (retrofitted) is operational. This is based on Building 2 looking compelte, and construction around Building 1 and 2 being mostly cleared. A colored motion artifact on one of the Building 1 cooling tower fa…","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-cedar-rapids","slug":"google-cedar-rapids-linn-county-ia","name":"Google Cedar Rapids","state":"IA","county":"Linn County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-cedar-rapids:construction_start:2024-06-14:epoch-ai-data-centers","date":"2024-06-14","kind":"milestone","milestone":"construction_start","description":"Land clearing begins.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins.","url":"https://datacenters.prithvidixit.com/facilities/google-cedar-rapids-linn-county-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1425043212","slug":"qts-nal-2-dc1-new-albany-oh","name":"QTS NAL 2 DC1","state":"OH","county":"Licking County","orgIds":["qts","qts-new-albany-ii-dc1-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-1425043212:land_acquired:2024-06-06:county-licking-oh","date":"2024-06-06","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 094-107502-00.003 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 094-107502-00.003 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/qts-nal-2-dc1-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1425043213","slug":"qts-nal-2-dc2-new-albany-oh","name":"QTS NAL 2 DC2","state":"OH","county":"Licking County","orgIds":["qts","qts-new-albany-ii-dc2-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-1425043213:land_acquired:2024-06-06:county-licking-oh","date":"2024-06-06","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 094-107502-00.004 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 094-107502-00.004 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/qts-nal-2-dc2-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1425043215","slug":"qts-nal1-dc1-new-albany-oh","name":"QTS NAL1 DC1","state":"OH","county":"Licking County","orgIds":["qts","qts-new-albany-i-dc1-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-1425043215:land_acquired:2024-06-06:county-licking-oh","date":"2024-06-06","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 094-106404-00.011 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 094-106404-00.011 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/qts-nal1-dc1-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1425043214","slug":"qts-nal1-dc2-new-albany-oh","name":"QTS NAL1 DC2","state":"OH","county":"Licking County","orgIds":["qts","qts-new-albany-i-dc2-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-1425043214:land_acquired:2024-06-06:county-licking-oh","date":"2024-06-06","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 094-106404-00.010 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 094-106404-00.010 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/qts-nal1-dc2-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-dalton-1-and-2","slug":"coreweave-dalton-1-and-2-whitfield-county-ga","name":"CoreWeave Dalton 1 & 2","state":"GA","county":"Whitfield County","orgIds":["coreweave","openai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-coreweave-dalton-1-and-2:construction_start:2024-06-03:epoch-ai-data-centers","date":"2024-06-03","kind":"milestone","milestone":"construction_start","description":"According to a [few](https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-high-performance-computing-services-capturing-significant-ai-compute-opportunity) [sources](https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm), Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, \"The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025.\"","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-dalton-1-and-2-whitfield-county-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":13,"limit":100,"offset":0,"dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}