{"data":[{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0027: Active","after":"Site plan EPLAN-2024-0193: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":183925,"after":161950,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 183,900 sq ft → 162,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2024-0047 : Active","after":"Site plan EPLAN-2023-0083: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":96842,"after":113000,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 96,800 sq ft → 113,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2023-0048: Approved","after":"Site plan EPLAN-2025-0195: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":67840,"after":751902,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 67,800 sq ft → 751,900 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan STPL-2023-0008: Approved: Conditionally","after":"Site plan LEGI-2024-0058: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":285200,"after":196138,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 285,200 sq ft → 196,100 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan EPLAN-2024-0036: Active","after":"Site plan EPLAN-2025-0102: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":697500,"after":16049,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 697,500 sq ft → 16,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0015: Active","after":"Site plan STMP-2022-0020: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":20000,"after":621481,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 20,000 sq ft → 621,500 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:status:loudoun-dc-parcels:2026-10-12","date":"2026-10-12","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"loudoun-dc-parcels","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.sqft:loudoun-dc-parcels:2026-10-12","date":"2026-10-12","kind":"value","field":"size.sqft","before":531592,"after":1063133,"sourceId":"loudoun-dc-parcels","evidenceLevel":"confirmed","text":"Floor area: 531,600 sq ft → 1.06M sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0027: Active","after":"Site plan EPLAN-2024-0193: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":183925,"after":161950,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 183,900 sq ft → 162,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2024-0047 : Active","after":"Site plan EPLAN-2023-0083: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":96842,"after":113000,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 96,800 sq ft → 113,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2023-0048: Approved","after":"Site plan EPLAN-2025-0195: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":67840,"after":751902,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 67,800 sq ft → 751,900 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan STPL-2023-0008: Approved: Conditionally","after":"Site plan LEGI-2024-0058: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":285200,"after":196138,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 285,200 sq ft → 196,100 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan EPLAN-2024-0036: Active","after":"Site plan EPLAN-2025-0102: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":697500,"after":16049,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 697,500 sq ft → 16,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0015: Active","after":"Site plan STMP-2022-0020: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":20000,"after":621481,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 20,000 sq ft → 621,500 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:status:loudoun-dc-parcels:2026-10-05","date":"2026-10-05","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"loudoun-dc-parcels","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.sqft:loudoun-dc-parcels:2026-10-05","date":"2026-10-05","kind":"value","field":"size.sqft","before":531592,"after":1063133,"sourceId":"loudoun-dc-parcels","evidenceLevel":"confirmed","text":"Floor area: 531,600 sq ft → 1.06M sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-08-31:epoch-ai-data-centers","date":"2026-08-31","kind":"milestone","milestone":"phase_operational","description":"Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.it_mw","before":77,"after":108,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 77 MW → 108 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.facility_mw","before":102,"after":139,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 102 MW → 139 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-08-01:epoch-ai-data-centers","date":"2026-08-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a reference.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","county":"Cumberland County","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:status:epoch-ai-data-centers:2026-07-12","date":"2026-07-12","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:size.buildings_operational:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:phase_operational:2026-06-16:epoch-ai-data-centers","date":"2026-06-16","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:land_acquired:2026-05-28:county-licking-oh","date":"2026-05-28","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":27,"after":82,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 27 MW → 82 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":38,"after":114,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 38 MW → 114 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","county":"Chesterfield County","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":174,"after":238,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 174 MW → 238 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":208,"after":286,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 208 MW → 286 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:status:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","county":"Prince William County","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational, based off of colored motion artifacts from cooling towers.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational, based off of colored motion artifacts from cooling towers.","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","county":"Licking County","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:status:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":144,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 144 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":202,"after":252,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 202 MW → 252 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":4,"after":5,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 5","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:status:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 5 is estimated to be operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 5 is estimated to be operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":48,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 48 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":67,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 67 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":1,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 3","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 2 and 3 are operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 and 3 are operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.it_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.it_mw","before":216,"after":303,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 216 MW → 303 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.facility_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.facility_mw","before":260,"after":364,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 260 MW → 364 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:size.buildings_operational:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","county":"Franklin County","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:phase_operational:2026-05-01:epoch-ai-data-centers","date":"2026-05-01","kind":"milestone","milestone":"phase_operational","description":"Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","county":"Cumberland County","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:size.buildings_operational:epoch-ai-data-centers:2026-04-15","date":"2026-04-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","county":"Cumberland County","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:status:epoch-ai-data-centers:2026-04-15","date":"2026-04-15","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","county":"Cumberland County","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:phase_operational:2026-04-15:epoch-ai-data-centers","date":"2026-04-15","kind":"milestone","milestone":"phase_operational","description":"High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT capacity (70 MW total facility power at a 1.4 PUE), based on DataOne's disclosure of a first 50 MW phase. SemiAnalysis estimated the full 50 MW was reached around January to February 2026 ([SemiAnalysis](https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter)); this April image is our first high-resolution confirmation that the cooling is in place.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT…","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.it_mw:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"power.it_mw","before":626,"after":910,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 626 MW → 910 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.facility_mw:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"power.facility_mw","before":751,"after":1092,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 751 MW → 1.09 GW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:size.buildings_operational:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"size.buildings_operational","before":11,"after":16,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 11 → 16","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:phase_operational:2026-03-23:epoch-ai-data-centers","date":"2026-03-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December.","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1426663253","slug":"amazon-iad-500-herndon-va","name":"Amazon IAD-500","state":"VA","county":"Fairfax County","orgIds":["amazon","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1426663253:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0001 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/amazon-iad-500-herndon-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1521913706","slug":"unnamed-data-center-redskin-drive-herndon-va","name":"Unnamed data center — Redskin Drive","state":"VA","county":"Fairfax County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1521913706:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0002 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/unnamed-data-center-redskin-drive-herndon-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-1521913707","slug":"unnamed-data-center-redskin-drive-herndon-va-2","name":"Unnamed data center — Redskin Drive","state":"VA","county":"Fairfax County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1521913707:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0003 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/unnamed-data-center-redskin-drive-herndon-va-2","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","county":"Licking County","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:power.it_mw:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"power.it_mw","before":113,"after":213,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 113 MW → 213 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","county":"Licking County","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:power.facility_mw:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"power.facility_mw","before":136,"after":255,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 136 MW → 255 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","county":"Licking County","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:size.buildings_operational:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"size.buildings_operational","before":5,"after":9,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 5 → 9","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","county":"Licking County","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:phase_operational:2026-03-12:epoch-ai-data-centers","date":"2026-03-12","kind":"milestone","milestone":"phase_operational","description":"Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html).","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildi…","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","county":"Fairfield County","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:status:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","county":"Licking County","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:land_acquired:2026-03-09:county-licking-oh","date":"2026-03-09","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:status:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:size.buildings_operational:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:status:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:phase_operational:2026-02-13:epoch-ai-data-centers","date":"2026-02-13","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, b…","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.it_mw","before":76,"after":368,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 76 MW → 368 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.facility_mw","before":99,"after":478,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 99 MW → 478 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"size.buildings_operational","before":1,"after":6,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 6","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-01-18:epoch-ai-data-centers","date":"2026-01-18","kind":"milestone","milestone":"phase_operational","description":"Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their right side which are not fully installed. Building 14 has chillers installed. Buildings 16-20 roofs are complete. The Socrates South power plant to the right of Buildings 7-11 has 7 gas turbines in place, judging by the exhaust stacks.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"power.it_mw","before":47,"after":77,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 47 MW → 77 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"power.facility_mw","before":66,"after":102,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 66 MW → 102 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-01-07:epoch-ai-data-centers","date":"2026-01-07","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational estimate. This is based on the progress visible in the September 2025 image. [The DEP](https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-4/56-4.pdf) also issues an air plan approval to add 48 more emergency generators on this date.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational estimate. This is based on the progress visible in the September 2025 image. The DEP also issues an air plan approval to add 48 more emergency generators on this date.","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.it_mw","before":72,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 72 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.facility_mw","before":101,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 101 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","county":"Henrico County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2025-12-31:epoch-ai-data-centers","date":"2025-12-31","kind":"milestone","milestone":"phase_operational","description":"Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","county":"St. Joseph County","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.it_mw:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"power.it_mw","before":398,"after":626,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 398 MW → 626 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":277,"limit":100,"offset":0,"next":"https://datacenters.prithvidixit.com/api/v1/changes?iso=PJM&offset=100&limit=100","dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}