{"data":[{"facilityId":"osm-way-1490401523","slug":"argo-data-center-dickens-county-tx","name":"Argo Data Center","state":"TX","county":"Dickens County","orgIds":["south-plains-electric-coop-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"osm-way-1490401523:status:osm:2026-10-12","date":"2026-10-12","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"osm","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/argo-data-center-dickens-county-tx","source":{"id":"osm","title":"OpenStreetMap — features tagged telecom=data_center or building=data_center","publisher":"OpenStreetMap contributors","url":"https://www.openstreetmap.org/copyright","license":"ODbL 1.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0027: Active","after":"Site plan EPLAN-2024-0193: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":183925,"after":161950,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 183,900 sq ft → 162,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2024-0047 : Active","after":"Site plan EPLAN-2023-0083: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":96842,"after":113000,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 96,800 sq ft → 113,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2023-0048: Approved","after":"Site plan EPLAN-2025-0195: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":67840,"after":751902,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 67,800 sq ft → 751,900 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan STPL-2023-0008: Approved: Conditionally","after":"Site plan LEGI-2024-0058: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":285200,"after":196138,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 285,200 sq ft → 196,100 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan EPLAN-2024-0036: Active","after":"Site plan EPLAN-2025-0102: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":697500,"after":16049,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 697,500 sq ft → 16,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:construction.permit_status:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0015: Active","after":"Site plan STMP-2022-0020: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.planned_sqft:loudoun-dc-pipeline:2026-10-12","date":"2026-10-12","kind":"value","field":"size.planned_sqft","before":20000,"after":621481,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 20,000 sq ft → 621,500 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:status:loudoun-dc-parcels:2026-10-12","date":"2026-10-12","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"loudoun-dc-parcels","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.sqft:loudoun-dc-parcels:2026-10-12","date":"2026-10-12","kind":"value","field":"size.sqft","before":531592,"after":1063133,"sourceId":"loudoun-dc-parcels","evidenceLevel":"confirmed","text":"Floor area: 531,600 sq ft → 1.06M sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0027: Active","after":"Site plan EPLAN-2024-0193: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"osm-node-14156477686","slug":"equinix-ashburn-dc18-ashburn-va","name":"Equinix Ashburn DC18","state":"VA","county":"Loudoun County","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-node-14156477686:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":183925,"after":161950,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 183,900 sq ft → 162,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/equinix-ashburn-dc18-ashburn-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2024-0047 : Active","after":"Site plan EPLAN-2023-0083: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2023-0083","slug":"proposed-data-center-beaumeade-loudoun-county-va","name":"Proposed data center — Beaumeade","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2023-0083:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":96842,"after":113000,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 96,800 sq ft → 113,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-beaumeade-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2023-0048: Approved","after":"Site plan EPLAN-2025-0195: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0195","slug":"proposed-data-center-eplan-2025-0195-loudoun-county-va","name":"Proposed data center — EPLAN-2025-0195","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0195:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":67840,"after":751902,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 67,800 sq ft → 751,900 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-eplan-2025-0195-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan STPL-2023-0008: Approved: Conditionally","after":"Site plan LEGI-2024-0058: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-legi-2024-0058","slug":"proposed-data-center-loudoun-tech-center-loudoun-county-va","name":"Proposed data center — Loudoun Tech Center","state":"VA","county":"Loudoun County","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-legi-2024-0058:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":285200,"after":196138,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 285,200 sq ft → 196,100 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-loudoun-tech-center-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan EPLAN-2024-0036: Active","after":"Site plan EPLAN-2025-0102: Active","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-eplan-2025-0102","slug":"proposed-data-center-prologis-exchange-loudoun-county-va","name":"Proposed data center — Prologis Exchange","state":"VA","county":"Loudoun County","orgIds":["dominion","prologis-exchange-43461-old-ox-road-llc"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-eplan-2025-0102:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":697500,"after":16049,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 697,500 sq ft → 16,000 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-prologis-exchange-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:construction.permit_status:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"construction.permit_status","before":"Site plan LEGI-2025-0015: Active","after":"Site plan STMP-2022-0020: Approved","sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.planned_sqft:loudoun-dc-pipeline:2026-10-05","date":"2026-10-05","kind":"value","field":"size.planned_sqft","before":20000,"after":621481,"sourceId":"loudoun-dc-pipeline","evidenceLevel":"confirmed","text":"Planned floor area: 20,000 sq ft → 621,500 sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-pipeline","title":"Pipeline Data Center Areas (site plans under review or approved)","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Pipeline_Data_Center_Areas/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:status:loudoun-dc-parcels:2026-10-05","date":"2026-10-05","kind":"value","field":"status","before":"operating","after":"under_construction","sourceId":"loudoun-dc-parcels","evidenceLevel":"estimated","text":"Status: Operating → Under construction","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"loudoun-pipeline-stmp-2022-0020","slug":"proposed-data-center-sdc-ashburn-loudoun-county-va","name":"Proposed data center — Sdc Ashburn","state":"VA","county":"Loudoun County","orgIds":["dominion","sdc-ashburn-alpha-i-llc","sdc-ashburn-i-llc","amazon"],"iso":"PJM","utilities":["dominion"],"id":"loudoun-pipeline-stmp-2022-0020:size.sqft:loudoun-dc-parcels:2026-10-05","date":"2026-10-05","kind":"value","field":"size.sqft","before":531592,"after":1063133,"sourceId":"loudoun-dc-parcels","evidenceLevel":"confirmed","text":"Floor area: 531,600 sq ft → 1.06M sq ft","url":"https://datacenters.prithvidixit.com/facilities/proposed-data-center-sdc-ashburn-loudoun-county-va","source":{"id":"loudoun-dc-parcels","title":"Existing Data Center Parcels","publisher":"Loudoun County, VA — Department of Planning & Zoning GIS","url":"https://services1.arcgis.com/MxjRokvPm7bjslyR/arcgis/rest/services/Existing_Data_Center_Parcel/FeatureServer/1","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.it_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.it_mw","before":152,"after":178,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 152 MW → 178 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:power.facility_mw:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"power.facility_mw","before":198,"after":231,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 198 MW → 231 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:compute.h100e:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"compute.h100e","before":173200,"after":202500,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Compute (H100-equivalents): 173,200 → 202,500","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:re.capex_usd_b:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"re.capex_usd_b","before":5.8,"after":6.7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Capital cost / investment: $5.8B → $6.7B","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:size.buildings_operational:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:status:epoch-ai-data-centers:2026-09-30","date":"2026-09-30","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-temple","slug":"meta-temple-temple-tx","name":"Meta Temple","state":"TX","county":"Bell County","orgIds":["meta","je-dunn","pedernales-electric-coop-inc"],"iso":"ERCOT","utilities":["pedernales-electric-coop-inc"],"id":"epoch-meta-temple:phase_operational:2026-09-30:epoch-ai-data-centers","date":"2026-09-30","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational. Based on the stated completion date in this regulatory filing","url":"https://datacenters.prithvidixit.com/facilities/meta-temple-temple-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:power.it_mw:epoch-ai-data-centers:2026-09-06","date":"2026-09-06","kind":"value","field":"power.it_mw","before":53,"after":368,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 53 MW → 368 MW","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:power.facility_mw:epoch-ai-data-centers:2026-09-06","date":"2026-09-06","kind":"value","field":"power.facility_mw","before":63,"after":442,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 63 MW → 442 MW","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:size.buildings_operational:epoch-ai-data-centers:2026-09-06","date":"2026-09-06","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:status:epoch-ai-data-centers:2026-09-06","date":"2026-09-06","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-pryor-north","slug":"google-pryor-north-pryor-ok","name":"Google Pryor (North)","state":"OK","county":"Mayes County","orgIds":["google","google-deepmind","public-service-co-of-oklahoma"],"iso":"SPP","utilities":["public-service-co-of-oklahoma"],"id":"epoch-google-pryor-north:phase_operational:2026-09-06:epoch-ai-data-centers","date":"2026-09-06","kind":"milestone","milestone":"phase_operational","description":"Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.","url":"https://datacenters.prithvidixit.com/facilities/google-pryor-north-pryor-ok","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-08-31","date":"2026-08-31","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","county":"Licking County","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-08-31:epoch-ai-data-centers","date":"2026-08-31","kind":"milestone","milestone":"phase_operational","description":"Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power plant (about 69% of the 200 MW nameplate capacity), and Buildings 7-10 roof vents are bright on infrared while Buildings 11-12 vents are not. That's 4/6 buildings operating, implying about 67% of capacity, which is consistent with 69% of the power plant operating. In the north, Buildings 16-27 (tents) look to be in a completed state. Each northern set of 6 tents still awaits to be connected to one of the corresponding power plants to become operational. Drone video from August 19th shows no turbines operating at Socrates North, though there are 3 small diesel generators operating. Building 13 (Vantage) is still under construction, we estimate another 3 months before operability.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 7-10 (tents) are operational, based on infrared drone video from RAAD (raad.com) captured on this date. The video suggests that 138.8 MW of nameplate turbine capacity is operating at the Socrates South power…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:size.buildings_operational:epoch-ai-data-centers:2026-08-30","date":"2026-08-30","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:status:epoch-ai-data-centers:2026-08-30","date":"2026-08-30","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-helios","slug":"coreweave-helios-afton-tx","name":"Coreweave Helios","state":"TX","county":"Dickens County","orgIds":["coreweave","openai","south-plains-electric-coop-inc","galaxy-digital-inc"],"iso":"ERCOT","utilities":["south-plains-electric-coop-inc"],"id":"epoch-coreweave-helios:phase_operational:2026-08-30:epoch-ai-data-centers","date":"2026-08-30","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational at full capacity. This is based on \"Phase I\", which is [expected](https://investor.galaxy.com/news/news-details/2025/Galaxy-Announces-Third-Quarter-2025-Financial-Results/default.aspx) to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/or installation of CoreWeave's chips, since the June 17 image still showed active minor construction around the building.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational at full capacity. This is based on \"Phase I\", which is expected to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/…","url":"https://datacenters.prithvidixit.com/facilities/coreweave-helios-afton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-gallatin","slug":"meta-gallatin-gallatin-tn","name":"Meta Gallatin","state":"TN","county":"Sumner County","orgIds":["meta","cumberland-elec-member-corp"],"iso":"None (non-RTO region)","utilities":["cumberland-elec-member-corp"],"id":"epoch-meta-gallatin:phase_operational:2026-08-24:epoch-ai-data-centers","date":"2026-08-24","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on a lack of construction activity around the shell and cooling equipment, and about 6 months passing after structural completion.","url":"https://datacenters.prithvidixit.com/facilities/meta-gallatin-gallatin-tn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-mesa","slug":"google-mesa-maricopa-county-az","name":"Google Mesa","state":"AZ","county":"Maricopa County","orgIds":["google","stone-applications-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-google-mesa:power.it_mw:epoch-ai-data-centers:2026-08-15","date":"2026-08-15","kind":"value","field":"power.it_mw","before":90,"after":183,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 90 MW → 183 MW","url":"https://datacenters.prithvidixit.com/facilities/google-mesa-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-mesa","slug":"google-mesa-maricopa-county-az","name":"Google Mesa","state":"AZ","county":"Maricopa County","orgIds":["google","stone-applications-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-google-mesa:power.facility_mw:epoch-ai-data-centers:2026-08-15","date":"2026-08-15","kind":"value","field":"power.facility_mw","before":126,"after":237,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 126 MW → 237 MW","url":"https://datacenters.prithvidixit.com/facilities/google-mesa-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-mesa","slug":"google-mesa-maricopa-county-az","name":"Google Mesa","state":"AZ","county":"Maricopa County","orgIds":["google","stone-applications-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-google-mesa:size.buildings_operational:epoch-ai-data-centers:2026-08-15","date":"2026-08-15","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/google-mesa-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-mesa","slug":"google-mesa-maricopa-county-az","name":"Google Mesa","state":"AZ","county":"Maricopa County","orgIds":["google","stone-applications-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-google-mesa:status:epoch-ai-data-centers:2026-08-15","date":"2026-08-15","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-mesa-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-mesa","slug":"google-mesa-maricopa-county-az","name":"Google Mesa","state":"AZ","county":"Maricopa County","orgIds":["google","stone-applications-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"epoch-google-mesa:phase_operational:2026-08-15:epoch-ai-data-centers","date":"2026-08-15","kind":"milestone","milestone":"phase_operational","description":"Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.","url":"https://datacenters.prithvidixit.com/facilities/google-mesa-maricopa-county-az","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:size.buildings_operational:epoch-ai-data-centers:2026-08-07","date":"2026-08-07","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:status:epoch-ai-data-centers:2026-08-07","date":"2026-08-07","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-aiken","slug":"meta-aiken-trenton-sc","name":"Meta Aiken","state":"SC","county":"Aiken County","orgIds":["meta","dominion-energy-south-carolina-inc"],"iso":"None (non-RTO region)","utilities":["dominion-energy-south-carolina-inc"],"id":"epoch-meta-aiken:phase_operational:2026-08-07:epoch-ai-data-centers","date":"2026-08-07","kind":"milestone","milestone":"phase_operational","description":"Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.","url":"https://datacenters.prithvidixit.com/facilities/meta-aiken-trenton-sc","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:size.buildings_operational:epoch-ai-data-centers:2026-08-02","date":"2026-08-02","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:status:epoch-ai-data-centers:2026-08-02","date":"2026-08-02","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-sarpy","slug":"meta-sarpy-springfield-ne","name":"Meta Sarpy","state":"NE","county":"Sarpy County","orgIds":["meta","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-meta-sarpy:phase_operational:2026-08-02:epoch-ai-data-centers","date":"2026-08-02","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational (estimate).","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational (estimate).","url":"https://datacenters.prithvidixit.com/facilities/meta-sarpy-springfield-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.it_mw","before":77,"after":108,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 77 MW → 108 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.facility_mw","before":102,"after":139,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 102 MW → 139 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","county":"Luzerne County","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-08-01:epoch-ai-data-centers","date":"2026-08-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a reference.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-kansas-city-east","slug":"google-kansas-city-east-clay-county-mo","name":"Google Kansas City East","state":"MO","county":"Clay County","orgIds":["google"],"utilities":[],"id":"epoch-google-kansas-city-east:size.buildings_operational:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-kansas-city-east-clay-county-mo","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-kansas-city-east","slug":"google-kansas-city-east-clay-county-mo","name":"Google Kansas City East","state":"MO","county":"Clay County","orgIds":["google"],"utilities":[],"id":"epoch-google-kansas-city-east:status:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-kansas-city-east-clay-county-mo","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-kansas-city-east","slug":"google-kansas-city-east-clay-county-mo","name":"Google Kansas City East","state":"MO","county":"Clay County","orgIds":["google"],"utilities":[],"id":"epoch-google-kansas-city-east:phase_operational:2026-08-01:epoch-ai-data-centers","date":"2026-08-01","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational. Estimated based on present construction progress and typical timelines.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational. Estimated based on present construction progress and typical timelines.","url":"https://datacenters.prithvidixit.com/facilities/google-kansas-city-east-clay-county-mo","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:size.buildings_operational:epoch-ai-data-centers:2026-07-25","date":"2026-07-25","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:status:epoch-ai-data-centers:2026-07-25","date":"2026-07-25","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-cheyenne","slug":"meta-cheyenne-laramie-county-wy","name":"Meta Cheyenne","state":"WY","county":"Laramie County","orgIds":["meta","black-hills"],"iso":"None (non-RTO region)","utilities":["black-hills"],"id":"epoch-meta-cheyenne:phase_operational:2026-07-25:epoch-ai-data-centers","date":"2026-07-25","kind":"milestone","milestone":"phase_operational","description":"Both buildings estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Both buildings estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-cheyenne-laramie-county-wy","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-core42-lake-mariner","slug":"core42-lake-mariner-barker-ny","name":"Core42 Lake Mariner","state":"NY","county":"Niagara County","orgIds":["core42","g42","google","niagara-mohawk-power-corp"],"iso":"NYISO","utilities":["niagara-mohawk-power-corp"],"id":"epoch-core42-lake-mariner:status:epoch-ai-data-centers:2026-07-23","date":"2026-07-23","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/core42-lake-mariner-barker-ny","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","county":"Cumberland County","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:status:epoch-ai-data-centers:2026-07-12","date":"2026-07-12","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-xai-qts-atlanta","slug":"xai-qts-atlanta-atlanta-ga","name":"xAI QTS Atlanta","state":"GA","county":"Fulton County","orgIds":["spacexai","georgia-power"],"iso":"None (non-RTO region)","utilities":["georgia-power"],"id":"epoch-xai-qts-atlanta:status:epoch-ai-data-centers:2026-07-10","date":"2026-07-10","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/xai-qts-atlanta-atlanta-ga","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:power.it_mw:epoch-ai-data-centers:2026-07-07","date":"2026-07-07","kind":"value","field":"power.it_mw","before":158,"after":237,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 158 MW → 237 MW","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:power.facility_mw:epoch-ai-data-centers:2026-07-07","date":"2026-07-07","kind":"value","field":"power.facility_mw","before":190,"after":284,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 190 MW → 284 MW","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:size.buildings_operational:epoch-ai-data-centers:2026-07-07","date":"2026-07-07","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:status:epoch-ai-data-centers:2026-07-07","date":"2026-07-07","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-council-bluffs-east","slug":"google-council-bluffs-east-council-bluffs-ia","name":"Google Council Bluffs (East)","state":"IA","county":"Pottawattamie County","orgIds":["google","google-deepmind","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-google-council-bluffs-east:phase_operational:2026-07-07:epoch-ai-data-centers","date":"2026-07-07","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the south…","url":"https://datacenters.prithvidixit.com/facilities/google-council-bluffs-east-council-bluffs-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.it_mw:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"power.it_mw","before":131,"after":262,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 131 MW → 262 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:power.facility_mw:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"power.facility_mw","before":183,"after":367,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 183 MW → 367 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:size.buildings_operational:epoch-ai-data-centers:2026-07-03","date":"2026-07-03","kind":"value","field":"size.buildings_operational","before":4,"after":7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 7","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-coreweave-denton-tx","slug":"coreweave-denton-tx-denton-tx","name":"CoreWeave Denton TX","state":"TX","county":"Denton County","orgIds":["coreweave","openai","denton-county-elec-coop-inc"],"iso":"ERCOT","utilities":["denton-county-elec-coop-inc"],"id":"epoch-coreweave-denton-tx:phase_operational:2026-07-03:epoch-ai-data-centers","date":"2026-07-03","kind":"milestone","milestone":"phase_operational","description":"Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the [Q2 2026 Earnings call](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf) stating the campus was operational by midyear 2026.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-denton-tx-denton-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"osm-way-290307022","slug":"cogent-data-center-phoenix-az","name":"Cogent Data Center","state":"AZ","county":"Maricopa County","orgIds":["cogent","cube-data-center-company-llc","srp"],"iso":"None (non-RTO region)","utilities":["srp"],"id":"osm-way-290307022:land_acquired:2026-07-01:county-maricopa-az","date":"2026-07-01","kind":"milestone","milestone":"land_acquired","description":"Deed recorded for parcel 113-54-017A (owner of record: Cube Data Center Company LLC).","sourceId":"county-maricopa-az","evidenceLevel":"confirmed","text":"Land acquired: Deed recorded for parcel 113-54-017A (owner of record: Cube Data Center Company LLC).","url":"https://datacenters.prithvidixit.com/facilities/cogent-data-center-phoenix-az","source":{"id":"county-maricopa-az","title":"Assessor Parcels","publisher":"Maricopa County Assessor's Office, AZ","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0","license":"Public record","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:power.it_mw:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"power.it_mw","before":69,"after":103,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 69 MW → 103 MW","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:power.facility_mw:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"power.facility_mw","before":82,"after":123,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 82 MW → 123 MW","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-midlothian","slug":"google-midlothian-midlothian-tx","name":"Google Midlothian","state":"TX","county":"Ellis County","orgIds":["google","sharka-llc","united-electric-coop-service-inc-tx"],"iso":"ERCOT","utilities":["united-electric-coop-service-inc-tx"],"id":"epoch-google-midlothian:status:epoch-ai-data-centers:2026-07-01","date":"2026-07-01","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-midlothian-midlothian-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.it_mw:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"power.it_mw","before":158,"after":237,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 158 MW → 237 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:power.facility_mw:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"power.facility_mw","before":189,"after":284,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 189 MW → 284 MW","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:size.buildings_operational:epoch-ai-data-centers:2026-06-30","date":"2026-06-30","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-omaha","slug":"google-omaha-omaha-ne","name":"Google Omaha","state":"NE","county":"Douglas County","orgIds":["google","google-deepmind","opdp"],"iso":"SPP","utilities":["opdp"],"id":"epoch-google-omaha:phase_operational:2026-06-30:epoch-ai-data-centers","date":"2026-06-30","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.","url":"https://datacenters.prithvidixit.com/facilities/google-omaha-omaha-ne","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:size.buildings_operational:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:status:epoch-ai-data-centers:2026-06-19","date":"2026-06-19","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-rosemount","slug":"meta-rosemount-rosemount-mn","name":"Meta Rosemount","state":"MN","county":"Dakota County","orgIds":["meta","northern-states-power-co-minnesota"],"iso":"MISO","utilities":["northern-states-power-co-minnesota"],"id":"epoch-meta-rosemount:phase_operational:2026-06-19:epoch-ai-data-centers","date":"2026-06-19","kind":"milestone","milestone":"phase_operational","description":"Buildings 1 and 2 are estimated to be operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 1 and 2 are estimated to be operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-rosemount-rosemount-mn","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:size.buildings_operational:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"size.buildings_operational","before":0,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 2","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:status:epoch-ai-data-centers:2026-06-18","date":"2026-06-18","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-meta-montgomery","slug":"meta-montgomery-montgomery-al","name":"Meta Montgomery","state":"AL","county":"Montgomery County","orgIds":["meta","hensel-phelps","alabama-power-co"],"iso":"None (non-RTO region)","utilities":["alabama-power-co"],"id":"epoch-meta-montgomery:phase_operational:2026-06-18:epoch-ai-data-centers","date":"2026-06-18","kind":"milestone","milestone":"phase_operational","description":"We estimate Buildings 1 and 2 are operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: We estimate Buildings 1 and 2 are operational.","url":"https://datacenters.prithvidixit.com/facilities/meta-montgomery-montgomery-al","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:size.buildings_operational:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","county":"Loudoun County","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:phase_operational:2026-06-16:epoch-ai-data-centers","date":"2026-06-16","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}},{"facilityId":"epoch-microsoft-project-osmium","slug":"microsoft-project-osmium-cumming-ia","name":"Microsoft Project Osmium","state":"IA","county":"Warren County","orgIds":["microsoft","openai","midamerican"],"iso":"MISO","utilities":["midamerican"],"id":"epoch-microsoft-project-osmium:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-project-osmium-cumming-ia","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-10-12"}}],"meta":{"total":600,"limit":100,"offset":0,"next":"https://datacenters.prithvidixit.com/api/v1/changes?offset=100&limit=100","dataAsOf":"2026-10-12"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}